Technical Unit Office at Old City of Jerusalem
Year of Finishing:
2002
Budget:
247507
Phase:
2
City:
Category:
Beneficiary:
A neglected house in disrepair was purchased by Welfare Association for reuse as OCJRP offices in the Old City. The two-level building was cleaned, and old slabs and plaster removed. Dressed stone was re-pointed and kept exposed. The original flooring in the first level and the geometric design floor tiles and “carpet” toned tiles on the second floor were restored. The roof was treated, and wood doors and windows were installed.